The Buddy Holly Hall of Performing Arts and Sciences

Lubbock, Texas

年度决赛入围者和最佳项目

所有者:Lubbock Entertainment and Performing Arts Association (LEPAA)

开发人员:Garfield Public/Private LLC

LEAD DESIGN FIRM/CIVIL:Parkhill

GENERAL CONTRACTOR:李·刘易斯建筑公司

STRUCTURAL ENGINEER:Parkhill, MWM Architects, Entuitive Corp.

MEP ENGINEER:Crossey Engineering LTD International Inc.; Parkhill

设计建筑师:钻石施密特建筑师;MWM建筑师

分包商:A Home Elevator Inc.; A+ Opening Solutions Inc.; Abco Fire Protection Inc.; ABF Commercial Roofing & Foam; American Terrazzo Co. Ltd.; Baker Drywall Ltd.; Bartos Architectural; Basden Steel Corp.; Beck Steel Inc.; BNR Concrete Polishing LLC; Charles Hargrove & Associates; CMC Construction Services; Door Control Services Inc.; Engineered Wall Systems Texas Inc.; GALA Systems Inc.; Guardian Utility Construction LLC; Hairel Enterprises Inc.; Horizon Glass; Hub City Plumbing & Mechanical; Industrial Glass; Ingram Concrete LLC; Johnson Equipment Co.; LCR Contractors LLC; Lubbock Masonry; Luminous Egress; MCC LLC; Modern Fold; Otis Elevator Co.; Overhead Door Lubbock; Pioneer Millworks Inc.; Poblocki Sign Co. LLC; Precision Drilling; ProCLAD Inc.; Series Seating LLC; Settle Fence Co.; Sterling Building Materials Inc.; Trumble Crane & Rigging Inc.; Western Building Specialties; Won-Door Corp.; Yates Carpet and Tile


Honoring the city’s native son rock-and-roller, this $127.6-million performing arts campus is West Texas’ largest dedicated performance venue. Completed in December 2020, the center includes the four-level, 2,200-seat Helen DeVitt Jones Theater, the 425-seat Crickets Studio Theater, a 6,000-sq-ft multipurpose Grand Hall, the 22,000-sq-ft Ballet Lubbock Pre-Professional Academy, a 100 seat bistro and a 2,500-sq-ft commercial kitchen.

Buddy Holly Hall of Performing Arts and Sciences

Photo by Dsai and Casey Dunn Photography

展示柜大厅设有一个56英尺高的螺旋螺旋楼梯,以及霍莉(Holly)的拉丝铁图像,是由9,000个吉他拨片创建的Stratocaster。在外面,6,200平方英尺的“鸟尾”树冠是一种拆开的混凝土屋顶结构,该结构支撑在四个散落的混凝土柱上,每个尾巴都在相反的一侧平衡。

Buddy Holly Hall of Performing Arts and Sciences

Photo by Dsai and Casey Dunn Photography

Challenges included heat and the project’s floodplain location. Also, with the city economy booming, labor was difficult to find, so the workload was spread among several subcontractors. For the lobby stairs, the team had to procure rolled tube steel from another state and shop-weld it locally, while heavy stair sections had to be carefully winched through the trusses.

Buddy Holly Hall of Performing Arts and Sciences

Photo by Dsai and Casey Dunn Photography

Nearly every architectural feature in the building is custom made, including the 415 light fixtures making up the chandelier in the audience chamber, the tilt wall concrete panels in The Crickets Theater and the various sized CMUs in the Jones Theatre.