OWNER:The Procopio Cos.

LEAD DESIGN FIRM:DMS Design

GENERAL CONTRACTOR:Dellbrook | JKS

CIVIL ENGINEER:工程联盟

STRUCTURAL ENGINEER:LA Fuess Partners

MEP ENGINEER:Vlachos Associates

SUBCONTRACTORS:City Lift Parking (Automated Car Lift)


This 10-story, mixed-use high-rise built on the site of the old Spinney & Caldwell Shoe Factory was completed at budget, but it fell behind schedule amid COVID-19. The $66-million, three-phase, zero lot line project required a complex logistical schedule that included construction while the structure was occupied with its first residents.

在施工期间,居民最初居住在地板1到4的地板上,然后地板1到8。由于1920年3月,由于1920年3月,由于Covid-19的发作,这种情况就变得复杂了。施工完全停止了一个月。

The sustainably built project claims to set a new standard for real estate development in the Massachusetts gateway city of Lynn. The midsize urban center is one of only six arts and cultural districts in the state driving regional economic growth as an emerging arts destination.

The LEED-Platinum community facility includes wellness redesigned apartments that feature individual ventilation systems with enhanced filtration to provide continuous fresh air as well as ultra-low emission materials such as paint, flooring, wood and insulation. It also has rooftop gardens for growing produce, a fuel-saving automated parking system with six electric car charging stations and onsite solar power production.

The team used only “responsibly sourced, reclaimed wood throughout the property, in addition to sturdy beams,” the submission notes.