May 2016
More detailed information on the Top Design Firms:
顶级设计公司排名
Related Article:
Designers Predict California Construction Surge Will Continue
Rank 2016/2015 |
Company / Location / Website / Top Officer |
LIC。拱。工程 Leed AP |
Largest Project to Break Ground its Location Project Value ($ Mil.) |
市场领域的收入百分比** |
Regional Rev. 2015($ Mil) |
---|---|---|---|---|---|
1/1 |
Aecom * 洛杉矶|aecom.com 执行副总裁Peter J. Holland |
43 570 97 |
不提供
|
37Transportation 26General Building 10Water Supply |
674.29 |
2/2 |
WSP |帕森斯·布林克霍夫(Parsons Brinckerhoff) 萨克拉曼多|wsp-pb.com/usa Teri Zink, West Regional Business Manager |
11 315 58 |
公园塔
San Francisco 690.00 |
86Transportation 10General Building 3Water Supply |
252.83 |
3/4 |
Gensler 旧金山|gensler.com Andy Cohen, Co-CEO |
256 — 317 |
Broadcom
尔湾 不提供 |
81General Building 13Transportation 3主计划的开发/站点基础架构 |
229.20 |
4/— |
HDR 尔湾|hdrinc.com Kip Field, SoCal Area Manager; Graham Sharpe, VP, Managing Principal at HDR Engineering; and Todd Tierney, Director of Operations, West Region |
28 189 67 |
不提供
|
38Transportation 27Water Supply 14Sewerage/Solid Waste |
214.68 |
5/3 |
Stantec 尔湾|Stantec.com Alfonso Rodriguez, Vice President |
48 214 64 |
一个比佛利山庄
Beverly Hills 不提供 |
28General Building 25General Building 18Transportation |
210.66 |
6/5 |
Arcadis North America Highlands Ranch, Colo. | Arcadis.com John Jastrem, CEO |
— 110 — |
不提供
|
65Hazardous Waste 24其他一般建筑 6Sewerage/Solid Waste |
180.04 |
7/6 |
Arup 旧金山|arup.com Andy Howard, Americas Chairman |
— — — |
San Francisco Bay Bridge West Span Bike Pedestrian Maintenance Path
San Francisco 不提供 |
68General Building 28Transportation 3石油 |
117.43 |
8/12 |
Carollo Engineers Inc. Walnut Creek | carollo.com Ken Wilkins, Client Service Manager |
— 147 7 |
区域SAN ECHOWATER流量均衡项目
萨克拉曼多 115.00 |
65Sewerage/Solid Waste 34Water Supply |
102.58 |
9/13 |
Kimley-Horn Orange | kimley-horn.com 乔治·芬斯(George Fares),区域负责人 |
— 192 16 |
LAX Midfield Terminal
Los Angeles 961.00 |
67Transportation 29General Building 4Water Supply |
100.49 |
10/9 |
Michael Baker International Pittsburgh | mbakerintl.com 里克·鲁宾(Rick Rubin),高级副总裁兼区域主任 |
— 140 38 |
I-10/Jefferson
印第安人 42.50 |
32General Building 23Transportation 20Water Supply |
96.80 |
11/7 |
HNTB Corp. 圣安娜| hntb.com Art Hadnett, West Division President |
20 142 6 |
6th Street Viaduct
Los Angeles 420.00 |
98Transportation 2General Building |
95.45 |
12/15 |
HOK 旧金山|hok.com 校长安东·福斯(Anton Foss) |
84 16 182 |
San Mateo Maple Street Correctional Center
红木城 125.00 |
67General Building 33Transportation |
90.24 |
13/14 |
PSOMAS 洛杉矶|psomas.com Ryan McLean, CEO |
— 68 66 |
不提供
|
33General Building 25Transportation 18石油 |
89.89 |
14/16 |
Burns&McDonnell Brea | burnsmcd.com Renita Mollman,副总裁,总经理 |
— 31 3 |
不提供
|
88力量 8Transportation 3Hazardous Waste |
78.55 |
15/18 |
BKF工程师 红木城|bkf.com David LaVelle, President & CEO |
— 128 45 |
斯科特林荫大道校园
Santa Clara 250.00 |
69General Building 28Transportation 2主计划的开发/站点基础架构 |
72.36 |
16/17 |
HMC建筑师 洛杉矶|hmcarchitects.com Brian Staton, President & CEO |
72 — 40 |
Henry Mayo Newhall Hospital New Patient Tower
Valencia 110.00 |
100General Building |
65.98 |
17/48 |
HKS Inc. 洛杉矶|hksinc.com 斯科特·亨特(Scott Hunter),校长兼高级副总裁 |
34 — 41 |
Confidential Project
圣地亚哥 280.00 |
99General Building 1Transportation |
65.27 |
18/19 |
哈奇·莫特·麦克唐纳 普莱森顿| hatchmott.com Tony Purdon, Executive Vice President |
1 96 7 |
LA Metro Regional Connector
Los Angeles 1,400.00 |
95Transportation 3Sewerage/Solid Waste 2Water Supply |
64.28 |
19/21 |
Smithgroupjjr 旧金山|SmithGroupjjr.com Joyce Polhamus, Vice President, Office Director |
66 — 65 |
牧场洛杉矶朋友国家康复中心
Downey 228.00 |
100General Building |
59.29 |
20/24 |
LPA Inc. 尔湾|lpainc.com Dan Heinfeld, President |
66 25 132 |
400 Spectrum Center Drive
Camden, Irvine 不提供 |
100General Building |
58.86 |
21/22 |
工程与测试服务公司* 圣拉蒙|ce-labs.com Gary M. Cappa, President & CEO |
— 15 — |
CPMC Van Ness和Geary Campus
San Francisco 700.00 |
85General Building 10Transportation 1Manufacturing |
53.65 |
22/26 |
T.Y. Lin International 旧金山|tylin.com Alvaro J. Piedrahita, President & CEO |
2 100 2 |
I-10/Jefferson Road Interchange
印第安人 42.50 |
94Transportation 4Other Project Types 1Sewerage/Solid Waste |
50.30 |
23/23 |
Spec Services Inc. 喷泉谷|SpecServcies.com Kim R. Henry, President & CEO |
— 32 — |
不提供
|
100石油 |
49.37 |
24/29 |
DLR Group* 圣莫尼卡|dlrgroup.com Adrian Cohen, Senior Principal, California Regional Leader |
48 6 40 |
洛杉矶纪念体育馆的现代化和翻新
Los Angeles 270.00 |
100General Building |
48.82 |
25/34 |
Simpson Gumpertz和Heger 旧金山|sgh.com 罗纳德·汉堡(Ronald Hamburger),高级校长 |
8 86 15 |
不提供
|
60General Building 26力量 5石油 |
43.91 |
26/35 |
Perkins+Will 洛杉矶|perkinswill.com 董事总经理,校长埃里克·范·奥基(Eric Van Aukee) |
70 — 107 |
HCA Riverside Community Hospital Replacement Tower
Riverside 145.00 |
99General Building 1Transportation |
41.42 |
27/30 |
ZGF Architects LLP 洛杉矶|zgf.comTed A. Hyman, Partner |
35 — 30 |
University of California, Los Angeles, The Wasserman Football Center
Los Angeles 38.00 |
99General Building 1主计划的开发/站点基础架构 |
38.00 |
28/27 |
Ninyo&Moore岩土技术和环境科学顾问 圣地亚哥|ninyoandmoore.com Avram Ninyo, Principal Engineer |
— 30 1 |
John Wayne Airport Terminal Improvements
圣安娜 5.00 |
48General Building 20Transportation 14Water Supply |
37.70 |
29/38 |
Harley Ellis Devereaux 洛杉矶|hed.design J. Peter Devereaux,董事长兼首席执行官 |
49 3 59 |
LACCD Firestone Education Center
Los Angeles 52.00 |
100General Building |
36.40 |
30/36 |
GEI Consultants Inc. Rancho Cardova | geiconsultants.com 丹·旺克特(Dan Wanket),西部地区运营经理 |
— 751 — |
USACE Motco 100%设计
和睦 6.75 |
85Water Supply 12Transportation 2力量 |
36.40 |
31/32 |
DES Architects +工程师 红木城|des-ae.com C. Thomas Gilman, President, Principal |
33 12 45 |
The Cove
South San Francisco 197.00 |
100General Building |
34.05 |
32/42 |
珀金斯·伊士曼(Perkins Eastman) 旧金山|perkinseastman.com Erich Burkhart,校长兼执行董事 |
45 — 33 |
Marin General Hospital
绿色 349.00 |
100General Building |
33.30 |
33/31 |
Lionakis 萨克拉曼多|lionakis.com 唐纳德·麦卡利斯特(Donald McAllister),总裁 |
45 10 80 |
宣教大学学生参与中心
Santa Clara 52.70 |
100General Building |
31.99 |
34/44 |
MVE + Partners Inc. 尔湾|mve-architects.com Carl McLarand, Chairman & CEO |
24 — 28 |
Station Park Green
San Mateo 354.00 |
100General Building |
30.87 |
35/41 |
Langan 旧金山|langan.com Philip T. Tringale, Director of Western Region |
— 54 9 |
大教堂山医院(Sutter Health CPMC)
San Francisco 2,500.00 |
78General Building 8Transportation 6Industrial Process |
27.50 |
36/38 |
RMC水和环境 Walnut Creek | rmcwater.com Alyson Watson, President |
— 46 5 |
1A期再生水系统
普莱森顿 14.80 |
69Water Supply 31Sewerage/Solid Waste |
26.00 |
37/ - |
Mackay&Somps土木工程师公司 普莱森顿| msce.com James C. Ray Jr., President |
— 32 1 |
瓦利斯牧场
都柏林 150.00 |
100Other Project Types |
25.94 |
38/37 |
Wood Rodgers Inc. 萨克拉曼多|woodrodgers.com 马克·罗杰斯(Mark Rodgers),总裁 |
— — — |
不提供
|
38Water Supply 25主计划的开发/站点基础架构 13General Building |
25.17 |
39/ - |
Steinberg* 洛杉矶|steinberg.us.com 首席执行官戴维·哈特(David Hart) |
39 — 55 |
3033 Wilshire Tower
Los Angeles 78.00 |
100General Building |
24.95 |
40/49 |
Sandis Civil Engineers Surveyors Planners* Campbell | sandis.net 肯·奥尔科特(Ken Olcott),总裁 |
— 22 5 |
Stanford University Escondido Graduate Housing
Stanford 550.00 |
81General Building 9Other Project Types 5Transportation |
23.10 |
41/51 |
Terracon Consultants Inc. Olathe, Kan. | terracon.com 西方运营小组经理首席运营官Swaminathan Srinivasan(Vasan) |
4 12 1 |
佩里斯大坝地震修复
佩里斯 75.00 |
67General Building 14Other Project Types 11力量 |
22.88 |
42/ - |
Gannett Fleming 洛杉矶|gannettfleming.com John A. Derr, Executive Vice President & Regional Director |
1 5 — |
LA Metro Regional Connector
Los Angeles 1,500.00 |
95Transportation 3Hazardous Waste 1Water Supply |
22.77 |
43/43 |
阿特金斯北美* 圣地亚哥|atkinsglobal.com/en-GB/locations/ north-america David Quinn, Chief Financial Officer |
3 42 11 |
不提供
|
36Water Supply 32General Building 25Transportation |
21.72 |
44/ - |
泰勒设计 尔湾|WeAreTaylor.com 首席财务官加里·戴维森(Gary Davidson) |
20 — 8 |
兰乔·洛斯·阿米戈斯康复中心
Downey 180.00 |
100General Building |
21.50 |
45/72 |
David Evans and Associates Inc.* Tustin | deainc.com 马克·梅纳(Mark Miner),加利福尼亚地区经理 |
— 59 9 |
City of Champions Revitalization Project
英格伍德 2,300.00 |
86General Building 9Water Supply 5Transportation |
20.27 |
46/53 |
Solomon Cordwell Buenz 旧金山|scb.com Chris Pemberton, Principal |
26 — 31 |
150 Van Ness
San Francisco 161.00 |
100General Building |
20.27 |
47/45 |
Dokken工程 Folsom | dokkenengineering.com Richard Liptak, President |
— 49 — |
不提供
|
100Transportation |
20.10 |
48/47 |
CO Architects 洛杉矶|coarchitects.com 校长斯科特·凯尔西(Scott Kelsey) |
25 — 18 |
UC San Diego Health Outpatient Pavilion
La Jolla 81.00 |
100General Building |
19.94 |
49/46 |
Syska Hennessy Group 卡尔弗城|syska.com Gary Brennen, Co-President |
— 25 23 |
联合航空公司,7和8航站楼
Los Angeles 400.00 |
85General Building 7力量 4Transportation |
19.42 |
50/11 |
MWH Global Inc. Broomfield, Colo. | mwhglobal.com 艾伦·克劳斯(Alan Krause),首席执行官 |
3 60 — |
Big Tujunga Dam Underground Improvement Project
Tujunga 1.40 |
72Water Supply 19力量 6Sewerage/Solid Waste |
18.42 |
51/52 |
Carrier Johnson + Culture 圣地亚哥|carrierjohnson.com Gordon R. Carrier, Chairman & CEO, Design Principal |
29 18 18 |
球场村
圣地亚哥 244.74 |
100General Building |
18.25 |
52/40 |
罐头设计 洛杉矶|cannondesign.com Michael J. Smith, Principal |
24 — 26 |
不提供
|
100General Building |
18.10 |
53/61 |
Mazzetti 旧金山|mazzetti.com Jon Inman, Team Leader, Pacific Regional Lead |
— 21 16 |
Marin General Hospital
绿色 550.00 |
99General Building 1Telecommunications |
17.76 |
54/55 |
Thornton Tomasetti Inc. 洛杉矶|thorntontomasetti.com Stephan Eisenreich, Vice President & LA Office Director |
6 60 33 |
UCLA Mo Ostin Basketball Center
Los Angeles 25.00 |
94General Building 5Transportation 1Telecommunications |
17.28 |
55/ - |
整体组 奥克兰|IntegralGroup.com 美国西部地区副总裁,区域总监格里·福伯特(Gerry Faubert) |
— 28 36 |
不提供
|
100General Building |
16.45 |
56/68 |
SWCA环境顾问 帕萨迪纳|SWCA.com 首席运营官Joseph J. Fluder III |
— — — |
不提供
|
44力量 31General Building 16Transportation |
15.14 |
57/58 |
Quattrocchi Kwok Architects* Santa Rosa | qka.com Mark Quattrocchi, Principal |
21 — 8 |
Bella Vista Elementary School
San Ramon 27.60 |
100General Building |
13.90 |
58/60 |
RBB Architects Inc. 洛杉矶|rbbinc.com 首席执行官约瑟夫·巴尔博纳(Joseph Balbona) |
20 — 18 |
Miller Children's Hospital
Long Beach 12.99 |
100General Building |
13.70 |
59/62 |
拉特克里夫 Emeryville | ratcliffarch.com Dan Wetherell, Principal & CEO |
29 — 18 |
NorthBay Medical Center Expansion
Fairfield 159.00 |
100General Building |
13.50 |
60/73 |
Pei Cobb Freed&Partners Architects New York City | pcf-p.com 乔治·H·米勒(George H. Miller),执行合伙人 |
— — — |
Santa Clara Square Phases II and III
Santa Clara 不提供 |
100General Building |
13.01 |
61/56 |
Quad Knopf Inc. Visalia |quadknopf.com Michael D. Knopf,首席执行官 |
— 21 3 |
LERDO的Kern Justice设施
Bakersfield 100.49 |
35Transportation 25Water Supply 12General Building |
12.96 |
62/54 |
Bar Architects 旧金山|bararch.com 克里斯Haegglund, President & CEO |
25 — 45 |
Bay Meadows Blocks Res-7 & MU-4
San Mateo 87.50 |
100General Building |
12.41 |
63/64 |
Affiliated Engineers Inc.* 旧金山|aeieng.com Mike Bove, Principal |
— 19 19 |
School of Medicine Renovation at Stanford
Palo Alto 10.00 |
70General Building 21力量 8Industrial Process |
12.24 |
64/71 |
Wiss, Janney, Elstner Associates 旧金山|wje.com Kent Sasaki, Principal & Unit Manager |
7 30 — |
不提供
|
89General Building 5Transportation 4Manufacturing |
12.02 |
65/69 |
Salas O'Brien San Jose | salasobrien.com John Salas, Managing Principal |
3 17 6 |
不提供
|
68Telecommunications 28General Building 4力量 |
11.16 |
66/74 |
Mead & Hunt Inc.* 萨克拉曼多|meadhunt.com Jon Faucher, Vice President |
1 20 5 |
不提供
|
62Transportation 36Water Supply 2Other Project Types |
10.83 |
67/86 |
Interface Engineering 旧金山|interfaceengineering.com 校长Hormoz Janssens |
— 15 7 |
1625 Plymouth Office Development
Mountain View 65.00 |
99General Building 1Transportation |
10.67 |
68/76 |
Dewberry 萨克拉曼多|dewberry.com David Pavolko, Operations Manager |
5 7 8 |
不提供
|
96General Building 3Water Supply 1Sewerage/Solid Waste |
10.01 |
69/65 |
达林集团公司 普莱森顿| Dahlingroup.com 总统南希·基南(Nancy Keenan) |
38 — 33 |
Emerald Glen Aquatic Center
都柏林 33.00 |
96General Building 10Other Project Types |
10.00 |
70/70 |
Lee & Ro Inc.* City of Industry | lee-ro.com M. Steve Ro, CEO |
— 28 — |
Beachwood Sewer
伯班克市 10.00 |
54Sewerage/Solid Waste 46Water Supply |
9.50 |
71/63 |
霍利·彼得森·斯奈德 Newsunnyvale |hpsarch.com Alan E. Turner, President |
16 — 6 |
Sutter/Palo Alto Medical Foundation
都柏林 13.59 |
100General Building |
9.04 |
72/— |
德雷福斯 +布莱克福德建筑 萨克拉曼多|dreyfussblackford.com John C. Webre, President |
16 — 8 |
PG&E汽油运营技术培训中心
Winters 35.00 |
100General Building |
8.80 |
73 / - |
Buehler & Buehler Structural Engineers Inc. 萨克拉曼多|bbse.com 斯科特·胡克(Scott Hooker),总统 |
— 40 9 |
黄金1中心
萨克拉曼多 448.00 |
100General Building |
8.50 |
74/77 |
Cowi North America Inc. Seattle | cowi-na.com Steven Hunt, President & CEO |
— 11 — |
Tesoro Avon Trestle
Martinez 60.00 |
96Transportation 4Sewerage/Solid Waste |
8.39 |
75/67 |
Tait & Associates Inc. 圣安娜| tait.com Thomas F. Tait, CEO |
1 9 — |
子午线Shopping
子午线 12.50 |
100General Building |
8.32 |
76/82 |
JCJ Architecture 圣地亚哥|jcj.com Mark Griffith, Managing Principal |
7 — 5 |
好莱坞公园Casino
好莱坞公园 49.50 |
100General Building |
7.13 |
77/79 |
PBS Engineers Inc. Glendora | pbsengineers.com Kunal G. Shah, President |
— 10 5 |
Westfield Century City Mall Renovations
Los Angeles 800.00 |
65Transportation 35General Building |
6.81 |
78/78 |
Project Design Consultants 圣地亚哥|projectdesign.com Greg Shields, CEO |
1 12 1 |
千禧2期分级
Chula Vista 4,000.00 |
39主计划的开发/站点基础架构 32General Building 12Other Project Types |
6.62 |
79/85 |
Architectural Nexus Inc. 萨克拉曼多|archnexus.com 查理·唐斯(Charlie Downs),高级校长 |
8 — 5 |
Lincoln High School Performing Arts Center
Stockton 7.68 |
100General Building |
4.95 |
80/81 |
Kwan Henmi Architecture & Planning Inc. 旧金山|kwanhenmi.com 首席执行官Denis A. Henmi |
10 — 14 |
Sonoma County- Fleet Building
Sonoma 7.00 |
70General Building 30Transportation |
4.91 |
81/59 |
Nadel Inc. 洛杉矶|nadelarc.com Herbert Nadel, CEO |
18 — 2 |
圣克莱门特广场
圣克莱门特 不提供 |
100General Building |
4.38 |
82/80 |
RS&H Inc. 旧金山|rsandh.com Joseph P. Jackson, Vice President |
1 1 3 |
Long Beach Airport Taxiway J
Long Beach 不提供 |
100Transportation |
3.48 |
83/84 |
Wilson & Co., Engineers and Architects 圣贝纳迪诺|wilsonco.com Larry G. Long, Vice President |
— 1 1 |
霍巴特院子路面改善
Commerce 3.50 |
86Transportation 6General Building 5石油 |
3.22 |
84/88 |
RNL Design Inc. 洛杉矶|rnldesign.com Pat McKelvey,校长 |
8 — 7 |
不提供
|
99General Building 1Other Project Types |
3.20 |
85/— |
Architecture Design Collaborative Costa Mesa | adcollaborative.com Craig Chinn, Founding Principal |
7 — 2 |
Anton Arcade
Sacremento 29.00 |
100General Building |
2.81 |
86/87 |
SB Architects 旧金山|sb-architects.com Scott A. Lee, President, Principal |
8 — 10 |
Lodge at Pebble Beach Renovations
卵石滩 不提供 |
100General Building |
2.59 |
87/89 |
R.M. Byrd and Associates Inc. Ontario | rmbyrd.com 总统里克·伯德(Rick Byrd) |
— 5 — |
港口ola High School
尔湾 130.00 |
100General Building |
2.19 |
88/90 |
JBA Consulting Engineers 尔湾|jbace.com Vic A. Sibilla, Executive Director of Project Operations |
— 3 1 |
格特顿度假村和赌场II期
罗恩特公园 175.00 |
100General Building |
1.90 |
89/— |
电气顾问公司 圣地亚哥| electricalconsultantsinc.com Bruce J. LaMeres, COO |
— 4 — |
不提供
|
100力量 |
1.40 |
90/96 |
Collins Engineers Inc. Seattle | collinsengr.com Glenn Gerschke, Division Manager |
— — — |
不提供
|
96Transportation 2General Building |
0.65 |
*REVENUE WAS PROVIDED ON A FISCAL-YEAR BASIS. ALL OTHERS PROVIDED CALENDAR-YEAR DATA, WHICH IS PREFERRED. ***由于其他其他市场类别和/或舍入的省略,可能不会增加100%。 |
版权所有©2022。所有权利保留了法国国民党媒体。
设计,CMS,托管和网络开发::ePublishing